Renovation

Best Point CoStars at Westwood

Best Point Westwood involved the renovation of an existing 12,000 square-foot church, the demolition of an 8,500 square-foot sanctuary, and the construction of a 7,300 square-foot addition. The updated design necessitated enhancements to both the existing water service and electrical infrastructure. The completed facility features multiple classrooms, treatment spaces, conference rooms, offices, playgrounds and a full-sized gymnasium.

We also integrated an elevator into the existing structure, implemented both wet and dry fire suppression systems, and completely overhauled the Mechanical, Electrical, and Plumbing systems. Through effective collaboration with the owner and design team, we successfully completed the project on time and within budget.

Client: Best Point Education and Behavioral Health

Client Industry: Education

Scope of Work: Renovation and New Construction

Delivery Method: Construction Manager at Risk

Let’s work together.

Interested in working together? Fill out some info and we will be in touch shortly! We can't wait to hear from you!

Previous
Previous

Logoplaste Warehouse

Next
Next

GII Holdings Warehouse Addition - Phase 2